Overhead night view of a lit rectangular pool with a paver terrace
Back to ResourcesCosts

What A Lead Should Cost For Pools, Pavers, Landscaping, Decks And Epoxy

Andrew LeonardAndrew Leonard, SocialWorks MarketingUpdated

Real cost per lead and per booked estimate, by trade

A lead for an outdoor living contractor runs about $20 to $70 on Facebook and Instagram, depending on the trade. But the cost of a lead is the wrong number to judge your marketing by. What matters is what it costs to get a qualified estimate on your calendar and a job sold.

Below are our real numbers by trade, then the math to figure out what a lead is allowed to cost in your business.

What Leads Cost By Trade

These are real ad accounts we manage. Each row is one contractor over the last 12 months.

TradeAd spendLeadsCost per lead
Epoxy floors$2,141108$20
Concrete$6,310172$37
Landscaping$8,353220$38
Deck and concrete restoration$11,068260$43
Pavers, patios and hardscape$15,116289$52
Pools$12,249204$60
Decks$13,650195$70

Seven accounts, $68,887 in ad spend, 1,448 leads.

The pattern is simple. The bigger the job, the more the lead costs. Far more homeowners are ready to coat a garage floor than to put in a pool, so there are more of them to reach and each one costs less.

Treat each row as a real baseline, not a price cap. It is one contractor in one market. A crowded metro costs more than a small town, and the busy season costs more than the slow one.

These are Facebook and Instagram numbers. Leads from Google search usually cost more each, because that homeowner is already out looking for a contractor. Judge both the same way: by what it costs to get a qualified estimate, not by what the lead cost.

Why Cost Per Lead Is The Wrong Number

A lead is a homeowner who filled out a form. That's it. It tells you nothing about whether they answer the phone, have the budget or live in your service area.

So a $20 lead can be the most expensive lead you ever buy, and a $70 lead can be cheap. You only find out when you follow it down to a sold job.

Follow One Lead Down To A Sold Job

Take the patio contractor from the table. His leads cost $52. Say he builds $20,000 patios at a 50% margin.

StepOut of 100 leadsCost each
Leads100$52
Booked estimates15$347
Qualified estimates12$433
Sold jobs3$1,733

Here is where each step comes from:

Booked estimates. You should turn 15% to 20% of leads into a booked estimate. Under that, the problem is usually how fast and how often the leads get called

Qualified estimates. Not every booked estimate is real. Some have no budget, some are outside your area, some want a small repair. In this example 12 of the 15 are worth the drive

Sold jobs. This one is yours to define. Your close rate depends on your pricing, your sales process and your market. We used 25%, or 1 in 4

Now the money:

Ad spend: $5,200

Revenue from 3 jobs: $60,000

Profit on those jobs at 50%: $30,000

Profit after ads: $24,800

He spent $1,733 in ads to land a $20,000 job. That is the number to judge your marketing on, not the $52.

That is ad spend only. Add what you pay your marketing company or the person calling your leads when you work out your true cost per job. And use your own margin, after materials and crew.

Work Backwards To Your Own Number

Flip the math and you can see what a lead is allowed to cost before you lose money:

Job size × margin × close rate × share of leads that become qualified estimates

With the example above:

$20,000 × 50% × 25% × 12% = $300

That contractor breaks even at $300 a lead. He is paying $52.

If you want ads to stay at 10% of revenue or less, swap the margin for 10%:

$20,000 × 10% × 25% × 12% = $60 a lead

Plug in your own job size, margin and close rate. If you don't know your close rate, count your last 20 estimates and how many of them signed.

The Lever That Matters Most

In the example, 12 of every 100 leads became a qualified estimate. Move that to 15 and the same $5,200 produces almost one more $20,000 job.

A cheaper lead can't do that. Getting more of your leads on the phone, asking the right questions before you drive out and booking the estimate while they are still interested can.

So before you chase a lower cost per lead, track these three in order:

  1. Cost per qualified estimate
  2. Cost per sold job
  3. Ad spend as a share of revenue

That is why we track booked estimates and sold jobs for our clients, not form fills.

When This Math Doesn't Apply

  • Small repair and cleanup jobs. Paid ads rarely pay off on small tickets
  • Nobody is answering or calling leads back fast. Fix that first or every number above gets worse
  • You are already booked out for months and can't take on more estimates

Common Questions

How much should I spend on ads each month?

Start from the jobs you want, not a budget. In the example above, 3 sold jobs took about $5,200 in ad spend. Work out your own cost per sold job, multiply it by the jobs your crew can take on in a month, and that is your number.

How many leads does it take to book one estimate?

About 5 to 7. A healthy account turns 15% to 20% of its leads into a booked estimate. If you need 15 or 20 leads to book one, look at how quickly leads get called before you blame the ads.

Why do pool leads cost more than epoxy leads?

Fewer homeowners are in the market for a pool at any given time, and the job is a much bigger decision. In our accounts a pool lead ran about $60 and an epoxy lead about $20. The pool job is also many times the size, so the math still works.

Is a cheaper lead always better?

No. A cheap lead that never answers, has no budget or lives an hour outside your area costs you time and a wasted drive. Judge leads by what it costs to get a qualified estimate and a sold job.

What close rate should I use in the math?

Your own. Pull your last 20 estimates and count how many signed. If you have no history yet, 1 in 4 is a fair place to start, then replace it with your real number after a couple of months.

What should I track instead of cost per lead?

Cost per qualified estimate and cost per sold job. Those two tell you if your marketing is making you money. Cost per lead only tells you what a form fill costs.

Book A Call

Related Guides

All Guides